North Branch of HVEG exercise control and maintenance of 35-330 kV electric grid and is responsible for energy transport to the distribution network, as well as to the major consumers in 9 regions of the north zone of the Republic of Moldova. These areas include: Balti, Glodeni, Falesti, Ungheni, Singerei, Floresti, Rezina, Soldanesti, Riscani.
As per 01.01.2017 North Branch of HVEG exercise control at 58 35-330 kV substations with total installed power of 1444,55 MVA and one 330 kV substation Balti.
Total length of the overhead lines is indicated in the table below:
Voltage | As per 01.01.2016 (km) | |
by route | by circuit | |
330 kV | 48,65 | 48,65 |
110 kV | 676,32 | 843,63 |
35 kV | 367,96 | 406,93 |
Total 35-330 kV | 1092,93 | 1229,21 |
North Branch of HVEG is neighboring with Costesti HPP, EEG, Central branch of HVEG, North-West branch of HVEG, Gas Natural Fenosa, RED Nord, and Romania.
As per 01.01.2017 North Branch of HVEG has 298 employees.
Address: MD-3121; 180 Stefan cel Mare str., Balti
E-mail: [email protected]
Tel.: +373 (231) 2-30-21
Fax: +373 (231) 2-24-03
Working time: 8 am – 5 pm
ODG Working time: 24/24