Lot 1: Change of Power Transformers 110/ 35/ 10 kV and Reactor 400 kV
Project Name / Country: |
Op ID 42856 Moldelectrica Transmission Rehabilitation, Moldova |
Contract Duration: |
24 months |
Description: |
Re-Tender A: Lot 1: Change of Power Transformers 110/ 35/ 10 kV and Reactor 400 kV |
Contract(s)/Lot(s) Reference Name/Number: |
IFT No.: 42856/A2 |
Winner: |
SC EnergoBit SA,
Cluj-Napoca, 47/11, Taietura Turcului Street, Romania |
Contract price offered: |
EUR 6 960 980,00 (excluding VAT) (Evaluated value: EUR 11 246 980,00) |
Contract signing date: |
- |
Other tenderers: |
1. BEST Elektrik (Turkey)
2. ElectroTest-Grup S.R.L. (Moldova)
3. RIKO (Slovenia)
4. Tamini (Italy)
5. ETD (Czech Republic) |
Tender prices read out at Tender Opening: |
1. BEST Elektrik (Turkey)
2. ElectroTest-Grup S.R.L. (Moldova)
3. RIKO (Slovenia)
4. Tamini (Italy)
5. ETD (Czech Republic) |
EUR 8 131 302,00
EUR 3 433 142,00
EUR 9 023 197,51
EUR 8 891 679,84
EUR 6 543 003,00 |
Tender value evaluated: |
1. BEST Elektrik (Turkey)
2. RIKO (Slovenia)
3. Tamini (Italy)
4. ETD (Czech Republic) |
EUR 13 010 802,00
EUR 13 724 022,88
EUR 14 644 860,90
EUR 12 139 003,00 |
Tenderers rejected: |
ElectroTest-Grup S.R.L. (Moldova) |
Rejected due not submitting tender forms and tender security according to Tender requirements |
Lot. 2: Variable Shunt Reactor
Project Name / Country: |
Moldelectrica Transmission Rehabilitation, Moldova |
Contract Duration: |
24 months |
Description: |
Re-Tender A: Lot 2: Variable Shunt Reactor (Option) |
Contract(s)/Lot(s) Reference Name/Number: |
IFT No.: 42856/A2 |
Winner: |
Tamini Trasformatori,
Via Emilia, 37 , I – 20077 Melegnano, Italy |
Contract price offered: |
EUR 2 143 401,72 (excluding VAT) (Evaluated value: EUR 2 598 401,72) |
Contract signing date: |
- |
Other tenderers: |
1. Faramax |
Tender prices read out at Tender Opening: |
1. Faramax (Switzerland) |
EUR 3 850 000,00 |
Tender value evaluated: |
1. Faramax (Switzerland) |
EUR 5 075 000,00 |
Tenderers rejected: |
- |
- |
Project name: |
Moldova Romania Power Interconnection Phase I |
EBRD Project ID: |
47087 |
Country: |
Moldova |
Tender Exercise Name: |
PIU Consultancy services (Vulcanesti back-to back substation-EBRD/EIB/NIF co-financed Project component) |
ECEPP Tender Exercise ID: |
8151042 |
Procurement Method: |
Consultancy Single Stage Open |
Client Name: |
Moldelectrica |
Business sector: |
Power and Energy |
Notice Type: |
Contract Award Notice |
Publication Date: |
20/09/2019 11:37 |
Contract Award Notice
Tender/Contract Reference No: 8151042: PIU Consultancy services (Vulcanesti back-to back substation-EBRD/EIB/NIF co-financed Project component)
Scope Of Contract: The investment project is successfully implemented: the basic design is completed; all goods, works and services are procured in accordance with EBRD’s Procurement Policies and Rules, contractual disbursements are effected in a timely manner.
Duration of Contract: 48
Contract Award Date: 09/09/2019
Awarded Tenderer(s):
Manitoba Hydro International
211 Commerce Drive, Winnipeg, R3P1A3, Canada
Proposal Price (in evaluation currency): EUR 3,450,161.00
Proposal Price (Euro Equivalent): € 3,450,161.00
Is this a JVCA: Yes
JVCA Details:
Teshmont Consultants
1190 Waverley Street
Winnipeg, Manitoba, Canada, R3T 0P4
Lead partner: No
TransGrid Solutions Inc.
100-78 Innovation Drive
Winnipeg, Manitoba, Canada, R3T 6C2
Lead partner: No
The Ciera Group
300, 1933 10th Avenue SW
Calgary, Alberta, Canada, T3C 0K3
Lead partner: No
Energy Design and Consulting SRL
89-91 Hagi Ghita, 2nd Floor, Sector 1
Bucharest, Romania, 011502
Lead partner: No
Manitoba Hydro International Ltd.
211 Commerce Drive
Winnipeg, Manitoba, Canada, R3P 1A3
Lead partner: Yes
Evaluated Tenderer(s):
DKZ ELEKTRİK MÜHENDİSLİK İNŞ. SAN. VE TİC. LTD. ŞTİ.
Cumhuriyet Bulv. No:139/8 Alsancak - İZMİR/TURKEY, İZMİR, 35220, Turkey
Is this a JVCA: No
EFH TEKNIK MUSAVIRLIK MUHENDISLIK MIMARLIK YAP. YAY. SAN. VE TIC. LTD. STI
Alacaatlı Mah. Beyler Cad. 4761. Sok. No:5 Cankaya / Ankara, Ankara, 06810, Turkey
Is this a JVCA: Yes
JVCA Details:
3AB Enerji ve Sanayi Tesisleri Tic. A.Ş.
Batı Sitesi Mah. Gersan Sanayi Sitesi 2307. Sokak No: 5
Yenimahalle, Turkey, 06370
Lead partner: Yes
EFH Teknik Müşavirlik Mühendislik Mimarlık Yap. Yay. San. ve Tic. Ltd. Şti.
Alacaatlı Mah. 4761. Sok. No: 5
Çankaya, Turkey, 06810
Lead partner: No
PentaPal Enerji Taahhüt A.Ş.
Mustafa Kemal Mah. 2079. Cad. Via Green Plaza No: 2 A Blok D:4
Çankaya, Turkey, 06520
Lead partner: No
Terna SpA
Viale egidio Galbani 70, Rome, ITALY, ROME, 00156, Italy
Is this a JVCA: Yes
JVCA Details:
Terna Plus Srl
Viale Egidio Galbani 70
Rome, Italy, 00156
Lead partner: Yes
CESI SpA
Via Rubattino, 54
Milano , Italy, 20134
Lead partner: No
Tractebel Engineering GmbH
Friedberger Strasse 173, Bad Vilbel, 61118, Germany
Is this a JVCA: No
WSP UK Limited
WSP House, 70 Chancery Lane, LONDON, WC2A 1AF, United Kingdom
Is this a JVCA: No
Project name: |
Moldova Romania Power Interconnection Phase I |
EBRD Project ID: |
47087 |
Country: |
Moldova |
Client Name: |
Moldelectrica |
ECEPP ID: |
13322399 |
Procurement Exercise Name: |
Design and construction of Vulcanesti back-to-back substation |
Procurement Exercise Description: |
Contract for the design and construction activities of Vulcanesti back-to-back substation including integration towards Romania and Moldova power systems |
Type of Procurement: |
Works |
Procurement Method: |
Open Tender Two Stage with PQQ |
Business Sector: |
Power and Energy |
Procurement Exercise Description: |
Contract for the design and construction activities of Vulcanesti back-to-back substation including integration towards Romania and Moldova power systems |
Notice Type: |
Invitation For Prequalification |
Publication Date: |
22/01/2021 10:32 |
Issue Date: |
25/01/2021 09:00 |
Closing Date: |
08/03/2021 15:00 |
Invitation For Prequalification
1. Funding Details
The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named contract(s).
Additional financing information:
The Project is co-financed by the European Investment Bank (EIB) and grant funding from EU Neighbourhood Investment Facility (NIF).
2. Information on the Procurement Exercise
Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents.
The type of contract and the procurement method is stated above. A full description of the procurement exercise is available within the documentation and is available free of charge in ECEPP.
The documentation will include such information as: detailed technical and financial requirements; any information on lots; the expected outcome; eligibility and qualification requirements; contract start date; planned contract duration; any response requirements; any other relevant information.
This procurement exercise will be conducted using the EBRD Client E-Procurement Portal (ECEPP). Prospective participants can access the procurement exercise by clicking on the below link or on the 'Access Opportunity' button (if viewing this notice on ECEPP). Registered participants may log in and access the documentation immediately and unregistered participants may do so after completing a brief registration:
https://ecepp.ebrd.com/respond/4P6634594R
3. Other Information
The Contractor will be required to complete the basic and detailed design, manufacture and test the required equipment, ship to site, construct the Vulcanesti back-to-back substation, and commission the Vulcanesti back-to-back substation according to a Master Commissioning Plan. The Contractor will also be responsible for requirements associated with the trial operation, warranty and defects liability periods, all in accordance with all applicable Moldavian and Romanian regulations, grid codes, other codes, local standards and international standards.
4. Client Address
The client's address is for information only. To register interest, access the documentation using the available links. Participants must use the ECEPP message centre for communication with the client.
Octavian Ciobirca
Moldelectrica
78, V. Alecsandri street
Chisinau
MD-2012
Moldova
Tel. tel. +373 22 253 548
Email: [email protected]
Project Name / Country: |
Op ID 42856 Moldelectrica Transmission Rehabilitation, Moldova |
Contract Duration: |
20 months |
Description: |
Reconstruction of 110 kV OHL (Tender D)
• Drochia - Suri with OPGW installation
• Suri - Donduseni with OPGW installation
• Chisinau - Hincesti with OPGW installation
• Hincesti - Cneazevca with OPGW installation
• Soldanesti - Ignatei |
Contract(s)/Lot(s) Reference Name/Number: |
IFT No.: 42856/D1 |
Winner: |
JVA ELM Electromontaj Cluj SA – S.C. Energobit S.A, Romania |
Contract price offered: |
EUR 5,376,670.78 (excluding VAT) |
Contract signing date: |
3 December 2015 |
Other tenderers: |
• CJSC Electroshield – TM Samara Group (Russia)
• Dalekovod j.s.c. (Croatia)
• JV Electrica Serv S.A. – S.C. Prelchim S.R.L. (Romania)
• Coget Impianti S.p.A. (Italy)
Soyuz, Corporation of Industrial and Commercial Enterprises (Ukraine) |
More details are available at the EBRD website
List of conditionally and unconditionally prequalified companies to be invited to participate in the tender for the project listed below:
Name of Project: SE Moldelectrica Transmission Network Rehabilitation, Moldova
Project ID: 42856 Moldelectrica intends using loans from European Bank for Reconstruction and Development (EBRD) and by the European Investment Bank (EIB) plus grant funding from EU Neighbourhood Investment Facility (NIF) for the SE Moldelectrica transmission network rehabilitation project. The operation will enable SE Moldelectrica to design and rehabilitate a number of substations and transmission lines. The rehabilitation will result in improved security and reliability of the transmission network and energy efficiency.
Funding Source: Loan proceeds from EBRD and EIB plus grant from EU/NIF
Name of Contract: Tender C - Reconstruction of Substation Bays (intended to be financed by EIB)
Type of Contract: Supply and Installation of Plant and Equipment
-
The following applicants are unconditionally prequalified:
-
TBEA Shenyang Transformer Group Co., Ltd (China)
-
ELCOMEX IEA (Romania)
-
Siemens (Romania)
-
KEC International Limited (India)
-
JSC Electroshield (Russia)
-
Alstom (Germany)
-
LLC Chornomorenergospetsmontazh (Ukraine)
-
Koncar (Croatia)
-
AK-AY Elektrik (Turkey)
-
EnergoBit S.A.(Romania)
-
ABB SRL (Romania)
-
EFACEC Contracting Central Europe GmbH (Portugal)
Op ID 42856 Moldelectrica Transmission Rehabilitation, Moldova
Project Name / Country: |
Op ID 42856 Moldelectrica Transmission Rehabilitation, Moldova |
Contract Duration: |
18 months |
Description: |
Tender B: Exchange of 110 kV Switchgear |
Contract(s)/Lot(s)
Reference Name/Number: |
IFT No.: 42856/B1 |
Winner: |
Chornomorenergospetsmontazh LLC (CHESM) 18a Ilfa i Petrova str, 65104 Odessa, Ukraine |
Contract price offered: |
EUR 4,793,119.50 (excluding VAT) |
Contract signing date: |
25 February 2016 |
Other tenderers: |
1. AK-AY ELEKTRIK (Turkey)
2. Siemens S.R.L. (Romania)
3. S.C. Energobit S:A (Romania)
4. JV Alstom Grid GmbH / Emon Electric S.A. (Germany/Romania)
5. Koncar (Croatia)
6. Efacec (Portugal)
7. Romelectro (Romania)
8. ABB (Romania)
9. Elcomex (Romania) |
More details are available at the EBRD website
List of conditionally and unconditionally prequalified companies to be invited to participate in the tender for the projects listed below:
Name of Project: SE Moldelectrica Transmission Network Rehabilitation, Moldova
Project ID: 42856
Moldelectrica intends using loans from European Bank for Reconstruction and Development (EBRD) and by the European Investment Bank (EIB) plus grant funding from EU Neighbourhood Investment Facility (NIF) for the SE Moldelectrica transmission network rehabilitation project. The operation will enable SE Moldelectrica to design and rehabilitate a number of substations and transmission lines. The rehabilitation will result in improved security and reliability of the transmission network and energy efficiency.
Funding Source: Loan proceeds from EBRD and EIB plus grant from EU/NIF
Name of Contract: Tender A - Change of Power Transformer 110/ 35/ 10 kV and Reactor 400 kV(intended to be fully financed by EIB)
Type of Contract: Supply and Installation of Plant and Equipment
Tender was cancelled.